You are not logged in.

Wet_Boots

Supreme Member

Posts: 4,021

Location: Metro NYC

11

Friday, July 27th 2007, 1:29am

One foot is deep enough. This is especially true when poly pipe is being pulled over deeper underground utilities, which can be (by code) as shallow as 18 inches.

Rate this thread