valve wiring
Dear sir, I have a long yard- about 1 acre, but only 100 feet wide. I have a shed over the well pump, and so wish to base the sprinkler system (put the timer, and main manifold) there. I am planning multiple flower beds all over, front yard and back. I am considering a 12 zone or more timer, since I am maxxed out at 1" pipe. (The pump has a 1" output). A more efficient idea as I see it is to run only a few pipes to remote locations and put in manifolds with multiple valves in those locations. My question is, how long a run can the wiring handle? All I need to do is bury a 250' run of pipe with associated wiring to a remote station with 6 valves, only to find I don't have enough juice to turn on the valves. My other option would be to run 6 250' pipes, see?